pThe station is moving along as scheduled. They are painting all the exposed steel in the bay area and insulating the inside. The stuck-o is being placed on the outside and the water lines are being run from the well to the building and to the area outside where we will have out B B Q cooking area. The sheet rock will be installed this week.p